House in Zebbug, Malta — House in Zebbug — Photo 1
HouseFor SaleVerified Partner

House in Zebbug

ZebbugListed 3w ago
€455,000

1996 per m²

PriceyFairGood Deal
Good Deal
djar Verified Partner
View original listing
3Bedrooms
4Bathrooms
228m²Area
HouseType

Don't miss the next one

Get instant WhatsApp alerts when new 3 bed houses for sale hit the market in Zebbug.

Get alerts free

Est. Mortgage

€1,921/mo

20% deposit, 4% rate, 25 yrs

Adjust in calculator

About this property

Description

Located in the charming village of Żebbuġ, Gozo, this exciting new development offers a selection of three beautifully designed terraced houses spread over three floors. With total internal and external areas ranging from approximately 228sqm to 277sqm, these homes have been thoughtfully planned to provide generous living spaces and modern comfort. Each property features a bright open-plan kitchen, living and dining area leading onto a spacious terrace, ideal for entertaining and outdoor relaxation. The houses comprise three double bedrooms, all enjoying their own ensuite bathroom, together with an additional guest bathroom. Two of the residences also benefit from an interconnected two-car garage at ground-floor level. The project is scheduled to be completed in shell form by September 2026 and fully finished by March 2027. Located in the charming village of Żebbuġ, Gozo, this exciting new development offers a selection of three beautifully designed terraced houses spread over three floors. With total internal and external areas ranging from approximately 228sqm to 277sqm, these homes have been thoughtfully planned to provide generous living spaces and modern comfort. Each property features a bright open-plan kitchen, living and dining area leading onto a spacious terrace, ideal for entertaining and outdoor relaxation. The houses comprise three double bedrooms, all enjoying their own ensuite bathroom, together with an additional guest bathroom. Two of the residences also benefit from an interconnected two-car garage at ground-floor level. The project is scheduled to be completed in shell form by September 2026 and fully finished by March 2027.

View original listing on Simon Mamo